FAQ
Projects
Location:
Home > Projects > Classic Case

Type I and Type II Fastening System for the Hohhot Highway-Railway Overpass - Anyang Railway Equipment

Jun 23, 2023
The road-rail overpass constructed by Hohhot Railway Construction Company of China Railway Sixth Bureau Group includes bridge engineering, road engineering, traffic engineering, drainage engineering, pumping station engineering, lighting engineering and other municipal supporting projects. Its construction has improved the life happiness index of residents along the road. It is of great historical significance to promote the economic development of the surrounding roads.
In 2023, Anyang Railway Equipment Co., Ltd. will provide Type I and Type II fastening system for the Hohhot highway-railway overpass.
No. Goods Products Unit Qty Remark
1 Railway Rail Construction Material Screw Spike Pcs 1361 /
2 Nut Pcs 1361 /
3 Joint Bar Pcs 17 with grade 10.9 high-strength joint bolts and grade 10 high-strength nuts
4 Type I Rail Clip Pcs 995  
5 Type II Rail Clip Pcs 798 Used for P60 Steel Rail
6 Single Elastic Washer Pcs 967  
7 Nylon baffle seat Pcs 1653  
8 Railway Rail Construction Material High Strength Flat Washer Pcs 967 Used for P60 Steel Rail
9 Guide Plate 10# Pcs 780
10 Guide Plate 6# Pcs 780
11 Guide Plate 20# Pcs 196
12 Guide Plate 14# Pcs 196
13 Rubber Pad P50-10-9 Pcs 196
14 Rubber Pad P60-10 Pcs 381
15 Rubber Pad IIIa Pcs 399
Type I and Type II Fastening System for the Hohhot Highway-Railway Overpass - Anyang Railway Equipment
Share: